Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (1): toevoegen | toon Print deze pagina

one publication added to basket [135103]
CLIMAR. Section report 3: adaptation measures to climate change impacts along the Belgian coastline
Van der Biest, K.; Verwaest, T.; Mostaert, F. (2009). CLIMAR. Section report 3: adaptation measures to climate change impacts along the Belgian coastline. Version 2.0. WL Rapporten, 814_01. Flanders Hydraulics Research: Antwerp. III, 20 + 8 p. app. pp.
Deel van: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , meer

Beschikbaar in  Auteurs 
Documenttype: Projectrapport

Trefwoorden
    Climatic changes
    Coastal protection > Coastal safety against extreme storms > Hinterland
    Coastal protection > Integrated Coastal Zone Management > Climate change
    Coastlines
    Flooding
    Literature and desktop study
    Measures
    Numerical modelling
    ANE, België, Belgische kust [Marine Regions]
    Marien/Kust

Project Top | Auteurs 
  • Evaluation of climate change impacts and adaptation responses for marine activities

Contactgegevens

Opdrachtgever: Federaal Wetenschapsbeleid (BELSPO), meer


Auteurs  Top 
  • Van der Biest, K., meer
  • Verwaest, T., meer
  • Mostaert, F., meer

Abstract
    This is the third section report written by Flanders Hydraulics Research in the framework of the BELSPO project CLIMAR. The report is part of work package 3 of the case-study coastal flooding, in which alternative adaptation measures to the increasing risks of coastal flooding as a consequence of climate change are identified. The research is based on international literature and on the outcomes of an interactive workshop with stakeholders from different coastal sectors, organized in the scope of work package 3 of CLIMAR. First, an overview is given of all the feasible structural and non-structural adaptation measures which where found in literature or proposed during the workshop. Second, this variety of solutions is projected onto the Belgian coastline. A more detailed evaluation of the proposed scenario’s will be carried out in the next work package of the project.

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs