Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Preparatory investigation
Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P. (2013). Preparatory investigation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 87-99
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., meer

Beschikbaar in  Auteurs 

Auteurs  Top 
  • Meylemans, E., meer
  • Haelterman, K.
  • De Beukelaer-Dossche, M., meer
  • Peeters, P., meer

Abstract
    A great deal of preparatory investigation preceded the organizational work at Bergenmeersen. This was necessary to gain an insight into soil quality and structure and the archaeological richness of the project area, since these elements influence the design and costs of the project.This chapter describes the results of the environmental, geotechnical and geophysical soil survey and the archaeological survey. It also examines the model trials of the inlet and outlet sluices. It is through these sluices that the Scheldt water will flow into and out of the flood control area with controlled reduced tide (FCA-CRT).

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs