The aim of this report is to document the output of the three workshops and the questionnaire. The results of the Flood risk analysis has been reported in another Floodsite report: De Bruijn et al., 2008. For a complete description of the Schelde pilot study reference is made to Chapter 8 of the FLOODsite book on pilot sites (Schanze, in prep.).
All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy