Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [250220]
Challenges in the design of the New Lock Terneuzen
Aerts, F.; De Winne, K. (2015). Challenges in the design of the New Lock Terneuzen, in: SMART RIVERS 2015, Buenos Aires, Argentina, 7-11 September 2015: papers booklet. pp. [1-14]

Available in  Authors 

Keywords
    Design
    ANE, Netherlands, Terneuzen Locks

Authors  Top 
  • Aerts, F., more
  • De Winne, K.

Abstract
    The lock complex at Terneuzen is the most important gateway to the ports of Terneuzen and Ghent and provides a shipping link between the Netherlands, Belgium and France. The project team New Lock Ghent-Terneuzen of the Flemish-Dutch Scheldt Commission currently works full-speed in preparation for a new, large lock within the existing lock complex. On completion the new lock will rank among the ten largest locks in the world.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors