Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [106029]
Toegangsgeul Zeesluis te Hingene: nautisch onderzoek fase 2bis en fase 3. Deel 3: vaarbaanplots (vervolg)
Laforce, E.; Wens, F. (1996). Toegangsgeul Zeesluis te Hingene: nautisch onderzoek fase 2bis en fase 3. Deel 3: vaarbaanplots (vervolg). WL Rapporten, 494_2. Vlaams Waterbouwkundig Laboratorium: Antwerpen. 122 p. fig. pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Access
    Cargo
    Contact force
    Cross flow
    Entrances
    Harbours and waterways > Safety  > Risk analysis
    Harbours and waterways > Ship motion > Fairway and harbour design
    Locks (Waterways)
    Model studies
    Pusher barges
    Risk analysis
    Simulations
    Simulators
    Water > Shallow water
    Belgium, Zeeschelde, Hingene Sea lock [Marine Regions]
    Brackish water

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Zeekanaal, more


Authors  Top 

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors