The Westerschelde tunnel: Connecting function, financing and safety aspects
Heijboer, J.; van Beek, R.J.; Worm, E.W. (1999). The Westerschelde tunnel: Connecting function, financing and safety aspects. Tunnelling and Underground Space Technology 14(2): 161-169. https://dx.doi.org/10.1016/S0886-7798(99)00030-9
Peer reviewed article  

Available in  Authors 

Keywords
    Marine/Coastal; Brackish water

Authors  Top 
  • Heijboer, J.
  • van Beek, R.J.
  • Worm, E.W.

Abstract
    The Westerschelde Tunnel will connect Zeeland Flanders and Central Zeeland. At its deepest point, the tunnel, composed of two tubes 6.6 km long and 11.3 m in diameter, will be 60 m below sea level. It will be opened for traffic at the beginning of 2003 and will be used by approximately 12,000 vehicles per day. The tunnel and associated roads will cost more than NLG 1.5 billion (approx. $US730 million). The tunnel will be run by a limited liability company, which will initially have two shareholders: the State of the Netherlands (95%) and the province of Zeeland (5%). The average toll will be NLG 11.75 (approx. $US5.75) (2003 prices). Characteristic features of the tunnel are its great length and depth and the high level of safety. The latter will be provided by features such as 26 transverse connections between the two tunnel tubes.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors