Integrated Marine Informations System - IMIS

Persons | Institutes | Publications | Projects | Datasets | Maps
[ report an error in this record ] Print this page

Soresma nv
Out of use record
This institute has changed, see institute underneath
Antea Belgium nv, more

Previous name: Belconsulting nv, more

Type: Commercial

Persons formerly associated with this organization (2)  Top | Publications | Projects 

Publications (23)  Top | Projects 
    split up filter
  • (2010). Aanvullend onderzoek bodemaspecten verruiming sluizencomplex Gent-Terneuzen. Soresma/Oranjewoud: België. 41 pp., more
  • Ides, S.J.; Plancke, Y.M.G.; Vos, G.R. (2010). Validation of a 2D hydrodynamic model within a study to propose the optimal disposal strategy in the Western Scheldt, in: SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010 [CD-ROM]. pp. [1-9], more
  • Ides, S.J.; Plancke, Y.M.G.; Vos, G.R. (2010). Validation of a 2D hydrodynamic model within a study to propose the optimal disposal strategy in the Western Scheldt, in: SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010: Recueil des résumés = SIMHYDRO 2010: Hydraulic modeling and uncertainties, Nice, 2-4 June 2010: book of abstracts. pp. [1], more
  • Plancke, Y.M.G.; Ides, S.J.; Vos, G.R.; Roose, F.; Peters, J.J. (2010). A new disposal strategy for the Western Scheldt, conciliating port accessibility and nature preservation, in: 32nd PIANC Congress, 125th anniversary PIANC - setting the course, Liverpool, UK, Liverpool Arena and Convention Centre, 10 - 14 May 2010: PIANC MMX papers. pp. [1-11], more
  • Plancke, Y.M.G.; Ides, S.J.; Vos, G.R.; Roose, F.; Peters, J.J. (2010). A new disposal strategy for the Western Scheldt, conciliating port accessibility and nature preservation, in: 32nd PIANC Congress, 125th anniversary PIANC - setting the course, Liverpool, UK, Liverpool Arena and Convention Centre, 10 - 14 May 2010: PIANC MMX book of abstracts. pp. 173, more
  • Soresma (2010). Zeeschelde L.O. te Kruibeke: realisatie v.e. gecontroleerd overstromingsgebied - integraal plan oktober 2010. rev06. Waterwegen en Zeekanaal/Agentschap voor Natuur en Bos: [s.l.]. 1 map pp., more
  • Van Hoestenberghe, T.; Huygens, M.; Peeters, P.; Mostaert, F. (2010). Opstellen bresgroeiparameters Vlaamse rivierdijken: deelopdracht 1. Literatuurstudie bresgroeiproces. versie 2.0. WL Rapporten, 706_08c. Waterbouwkundig Laboratorium/Soresma: Antwerpen. VI, 90 pp., more
  • Vanderkimpen, P.; D'Haeseleer, E.; Peeters, P.; Mostaert, F. (2010). Ondersteuning waterkering Antwerpen: deelrapport 2. Scenarioanalyse. Versie 2.0. WL Rapporten, 713_15c. Waterbouwkundig Laboratorium/Soresma: Antwerpen. III, 25 pp., more
  • Vanderkimpen, P.J.; Peeters, P.; Deckers, P.J. (2010). The impact of individual buildings on urban flood risk analysis, in: SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010 [CD-ROM]. pp. [1-9], more
  • Vanderkimpen, P.J.; Peeters, P.; Deckers, P.J. (2010). The impact of individual buildings on urban flood risk analysis, in: SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010: Recueil des résumés = SIMHYDRO 2010: Hydraulic modeling and uncertainties, Nice, 2-4 June 2010: book of abstracts. pp. [1], more
  • Vos, G. (2010). Evaluatie van de morfologische evolutie van de proefstorting op basis van bathymetrische monitoring [PRESENTATIE]. Flanders Hydraulics Research/Soresma: Antwerp. 18 slides pp., more
  • Plancke, Y.; Ides, S.; Peters, J.J.; Vos, G. (2009). Le projet pilote Walsoorden: la première étape dans la gestion morphologique de l'Escaut occidental, reconciliant la préservation de l'écologie et l'accessibilité des ports = The Walsoorden pilot project: a first step in a morphological management of the Western Scheldt, conciliating nature preservation and port accessibility, in: Congrès SHF-31ième Journées de l'hydraulique: "Morphodynamiques et débits solides dans les estuaires, les baies et les deltas" Paris, 22-23 septembre 2009 [CD-ROM]. pp. [1-11], more
  • International Marine and Dredging Consultants; Soresma; Resource Analysis (2007). Case study Durmevallei en Prosperpolder: deelopdracht 5: procesondersteunende tools. 2D morfologische modellering van Durme. Versie 3.0. AWZ. Afdeling Zeeschelde: [s.l.]. III, 41 + bijlagen pp., more
  • Huygens, M. (2006). Sediment tracing wordt chasing in een dynamisch estuarium [PRESENTATIE]. Soresma: [s.l.]. 24 slides pp., more
  • (2005). Geactualiseerd MER-richtlijnenboek. Discipline fauna en flora. Soresma: Antwerpen. 147 pp., more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2004). Actualisatie van het Sigmaplan. Integrale verkenning Scheldebekken. Integrale verkenning Rupelbekken. Planstudie rivierherstelproject Durme: deelopdracht 3. Hydrologische en hydraulische modellen: volume 3a. Scenarioanalyse: bijlagen. Versie 2.0. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: [s.l.]. bijlagen + cd-rom pp., more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2004). Actualisatie van het Sigmaplan - Integrale verkenning Scheldebekken - Integrale verkenning Rupelbekken - Planstudie rivierherstel project Durme: deelopdracht 3. Hydrologische en hydraulische modellen. Volume 1d: aanvullende statistiek scheldebekken. Versie 2.0. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: Antwerpen. ix, 151 pp., more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2004). Actualisatie van het Sigmaplan. Integrale verkenning Scheldebekken. Integrale verkenning Rupelbekken. Planstudie rivierherstelproject Durme: deelopdracht 4. Maatschappelijke impactstudie: morfologische modelstudie van de Grote Nete: volume 3. Morfologische effecten van een rivierverruiming in de Grote Nete. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: Antwerpen. III, 25 + appendices pp., more
  • (2003). De Wimp: computermodellering als methode, hoogwaterbeheer als doel. Soresma: Antwerpen. 36 pp., more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2002). Actualisatie van het Sigmaplan. Integrale verkenning Scheldebekken. Integrale verkenning Rupelbekken. Planstudie rivierherstelproject Durme: deelopdracht 2. Integrale afweging voor de actualisatie van het Sigmaplan. Omgevings- en sectorale analyse: Rupel. Versie 2.0. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: Antwerpen. , more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2002). Actualisatie van het Sigmaplan. Integrale verkenning Scheldebekken. Integrale verkenning Rupelbekken. Planstudie rivierherstelproject Durme: deelopdracht 2. Integrale afweging voor de actualisatie van het Sigmaplan. Omgevings- en sectorale analyse: Schelde. Versie 2.0. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: Antwerpen. , more
  • International Marine and Dredging Consultants; Belgroma; Soresma; HAECON; Resource Analysis; Technum (2002). Actualisatie van het Sigmaplan. Integrale verkenning Scheldebekken. Integrale verkenning Rupelbekken. Planstudie rivierherstelproject Durme: deelopdracht 2. Integrale afweging voor de actualisatie van het Sigmaplan. Bijlage waterbalans: Schelde. Versie 3.1. Ministerie van de Vlaamse Gemeenschap. Afdeling Zeeschelde: [s.l.]. 39 pp., more
  • Soresma; Technum-IMDC (2002). De Grote Nete: computermodellering als methode, hoogwaterbeheer als doel [BROCHURE]. AMINAL. Afdeling Water: Brussel. 44 pp., more

Projects (7)  Top | Publications 
  • Alternative disposal strategy Walsoorden - in situ disposal test 2004, more
  • Complete exploration of the Scheldt bassin for an update of the Sigmaplan, more
  • Construction of floodplain and nature reserves in the framework of the actualisation of the SIGMAPLAN - Dijle, more
  • Floodscape: Creating new landscapes for flood risk management, more
  • Monitoring by external contractors of the in situ disposal test near the Walsoorden sandbar 2004, more
  • Social cost-benefit analysis of the Sigmaplan, more
  • Social Impact study on reorganisation of the valleys of Durme and Grote Nete, more

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Publications | Projects