Integrated Marine Informations System - IMIS

Personen | Instituten | Publicaties | Projecten | Datasets | Kaarten
[ meld een fout in dit record ]mandje (0): toevoegen | toon Print deze pagina

Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan
De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp.

Beschikbaar in  Auteurs 

Trefwoorden
    Construction
    Floodplains
    België, Zeeschelde, Kalkense meersen
Author keywords
    Geactualiseerd Sigmaplan

Auteurs  Top 
  • De Beukelaer-Dossche, M., redacteur, meer
  • Decleyre, D., redacteur, meer

Inhoud
  • Decleyre, D.; De Beukelaer-Dossche, M. (2013). Introduction, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 7-8, meer
  • De Beukelaer-Dossche, M.; Van den Bergh, E. (2013). Context, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 11-29, meer
  • Van Rompaey, M.; Decleyre, D. (2013). Public support, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 31-43, meer
  • Van Rompaey, M. (2013). Conceptual choices, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 45-59, meer
  • Decleyre, D.; Maris, T.; Van Ryckegem, G. (2013). Nature, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 61-85, meer
  • Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P. (2013). Preparatory investigation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 87-99, meer
  • Van Looveren, R.; Moeskops, S.; Boone, C.; Peeters, P.; Decleyre, D. (2013). Technical design, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 101-109, meer
  • De Beukelaer-Dossche, M.; Vanremoortele, S. (2013). Work, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 111-119, meer
  • Maris, T.; Peeters, P. (2013). Monitoring, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 121-127, meer
  • De Beukelaer-Dossche, M. (2013). General evaluation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 129-133, meer

Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid Top | Auteurs